A.T. Construction Management Inc. was contracted to complete the building and the site work for this project through the property owner’s lease requirements. The existing building and site were demolished. Utilities, storm water management system, and concrete curbing/pavement were installed as part of the site work requirements. The building design features a Pre- Engineered Butler Building roof system integrated with structural CMU exterior walls. Due to the jurisdiction’s requirements, this building was designed with exterior insulated finish systems (EFIS) on the exterior walls, along with other unique features such as aluminum exterior canopies. The building is 7,225 sq. ft., which includes a customer sales area along with parts inventory/loading dock area for deliveries.
O’Reilly Auto Parts – St. Petersburg, FL

Related Projects
- Date
- January 2, 2025
We’re thrilled to announce that Wawa is opening its doors in Ridley Township, PA, on December 20th, 2024! Wawa has everything you need, from Built-To-Order food and beverages to coffee and fuel services.- Date
- October 16, 2024
2,966 SF office renovation for a customer-focused agency- Date
- April 15, 2024
The Beneficial Bank was built in Havertown, PA on the site of a church that relocated. This branch replaced a branch that was located in a strip center and did- Date
- April 7, 2024
This Starbucks Coffee is located on a site in Northeast Philadelphia. This is a ground-up, stand-alone building, which offers customers the ability to drive-thr